Issues to date with chemical pipes
In addition to design issues such as large dimensions and time-consuming installation, the types of joint that have been widely used until now have been plagued by management problems, for example post-installation management and maintenance, degraded performance following removal and reconnection, numerous variants and models, and high management costs.
Issues associated with joints
- Large dimensions 
- Numerous installation locations and work processes 
- Time-consuming management associated with joint performance and installation 
- Degraded performance following removal and reconnection 
- Large number of tube and part models and variants 
- Troublesome inventory management and lead time management 
A new connection technology is 
needed to resolve these issues.
The Nano Link solution
Four features made possible by Nano Link System: The standardization of connection technology will boost productivity in industry.


















 