Issues to date with chemical pipes
In addition to design issues such as large dimensions and time-consuming installation, the types of joint that have been widely used until now have been plagued by management problems, for example post-installation management and maintenance, degraded performance following removal and reconnection, numerous variants and models, and high management costs.
Issues associated with joints
Large dimensions
Numerous installation locations and work processes
Time-consuming management associated with joint performance and installation
Degraded performance following removal and reconnection
Large number of tube and part models and variants
Troublesome inventory management and lead time management
A new connection technology is
needed to resolve these issues.
The Nano Link solution
Four features made possible by Nano Link System: The standardization of connection technology will boost productivity in industry.